Applicant
Owner: Little Lake Communities Inc
Agent: MHBC Planning (Jamie Robinson)
Phone: 705-728-0045
Email: jrobinson@mhbcplan.com
Summary of Proposal
The proposed Official Plan Amendment is to redesignate these lands from ‘Greenlands’ and ‘Natural Heritage’ to more appropriate designations that would permit the development of a residential subdivision.
The proposed Zoning By-law Amendment is to rezone these lands from the Residential Zone (R1) to multiple site-specific zones. These permissions would allow for a variety of residential uses on this property and identify lands for environmental protection.
Technical Proposal
Official Plan Amendment
The effect of the Official Plan Amendment is to:
- Redesignate from ‘Greenlands’ to ‘Strategic Growth Area 1’ as shown on Schedule A – Growth Areas
- Redesignate from ‘Greenlands’ to ‘Neighbourhood Districts’ as shown on Schedule B – Urban Structure
- Redesignate from ‘Natural Heritage’ designation to ‘Neighbourhood Residential’ as shown on Schedule “C” – Land Use
Zoning By-law Amendment
The effect of the Zoning By-law Amendment is to rezone the lands from the R1 Zone to the following site-specific zoning and in accordance with Table 1:
- Exception Zone – RA-XX (Residential Apartment)
- Relief from Minimum Lot Frontage, Maximum Building Height, and Minimum Interior Side Yard Setback
- Exception Zone – R3-XX (Residential)
- Relief from Minimum Lot Area
- RT (Residential Townhouse)
- No relief required
- Exception Zone – EP-XX (Environmental Protection Zone)
- Relief from Minimum Lot Area and Minimum Lot Frontage
Supporting Documents
Planning Justification ReportEnvironmental Impact Study
Transportation Impact Study
Functional Servicing and Preliminary Stormwater Management Report
Archaeological Assessment
Status
First submission received and is under review.
The application has been deemed complete and a public meeting has been scheduled for December 4, 2024. View the Notice of Public Meeting for more information. A decision is not being made as this time. All comments received as part of the statutory consultation period will be provided to Council and addressed through a recommendation report at a later date.